This project carried out in 2012 in the town of Garachiné, province of Darién included the general repair of 4 classroom pavilions, sanitary services, construction of a septic tank and garage door, water tank, pump room and drainage field, and slab ceiling on the corridor for the General José de la Cruz Herrera Basic Educational Center.