This project required the survey, study, design and construction of Improvements to the Barú-Paso Canoas Water Treatment Plant.
This included design and development of plans, supply, installation, construction and commissioning of the Rapid Mixing and Flocculation Area, Settlers, Filters, Laboratory, Storage System, Treated Water Pumping System, Electrical system, Supply and installation of meters of flow and level, treatment of sewage from the plant and lighting.